Technical Data

  • Designs exceeding 40MW
  • Ability to offer composite and pre-baked electrode technology (depending on plant size), with the option of conversion to Al casing based Soderberg designs
  • Integrated design of primary smelting and gas cleaning, ensuring maximum silicon yield
  • Complete plant design, from materials receiving to final product, including silicon fume handling, crushing and screening and bagging facilities
  • Either positive or negative pressure reverse air gas cleaning systems, with maximum recovery of silicon fume – a significant revenue stream for Silicon metal operations.