Castellanza, June 20, 2018 – Tenova, a Techint Group company specialized in innovative solutions for the metals and mining industries, has been awarded an important contract with Metalloinvest, a leading global producer and supplier of HBI and iron ore products and a regional producer of high quality steel, for a major upgrade of the JSC Ural Steel melt shop located in Novotroitsk, Russian Federation.
The contract includes the installation of two Flexible Modular Furnaces® (FMF®), which accommodate a raw material charge mix up to 85% hot metal without use of electric energy. FMFs will replace the existing Electric Arc Furnace operating with 100% solid charge with Tenova FMF solution, which envisages flexible raw material charging (hot metal, scrap, DRI/HBI) according to its availability and related production cost.
Tenova FMF® is a modular concept of smelting furnace that can be developed from core equipment called base module with specific add-ons and has the flexibility of converting various charge mix of raw material (scrap, DRI, liquid hot metal, Pig Iron, etc.) without the use of electrical energy and electrodes. Full range of metallic charges can thus be smelted with capital costs reduced at the minimum level.
The adoption of Tenova FMF® enables steelmakers to gain a saving in the conversion cost of steel and ultimately to reduce steelmaking costs substantially. Flexibility is another main advantage of this solution. Each module is designed with specific features in order to fit the requirements of the charge mix.