The new furnace will enhance production efficiency and advance the Group’s sustainability goals
Salzgitter Flachstahl GmbH, the largest steelmaking subsidiary in the Salzgitter Group, has awarded Tenova a significant contract for the supply of a state-of-the-art walking beam furnace for slabs at the Salzgitter Flachstahl GmbH site. This new furnace, characterized by high energy efficiency, plays a key role in the group’s decarbonization roadmap while consolidating Tenova’s position in the German market.
Designed and supplied by Tenova Italimpianti, the furnace will handle slabs in both single and double-row configurations, with a capacity of 320 tons per hour. It will be equipped with a combustion air pre-heating system and oxygen injection zones, enabling optimized combustion and lower energy usage. The inclusion of hydrogen burners ensures compatibility with green hydrogen use, aligning with the company's transition to carbon-neutral production technologies.
The scope of supply includes the discharging roller table, charging and discharging machines, and all related electrical, measuring, and control systems, enabling a fully integrated and automated operation. A heat recovery system will capture waste heat to generate steam, which will be redistributed within the plant to further reduce overall energy demand.
This installation marks the third modern walking beam furnace at Salzgitter Flachstahl GmbH, further reinforcing the strategic partnership between the two companies in their pursuit of sustainable and innovative steelmaking solutions.
Related technologies
Want to know more?
Get in touch with our experts on the subject